Corrections Policy & Transparency Notice

Last Updated: November 7, 2026 • Verified Editorial Policy

Last updated: October 2026

At Odia Calendar (ଓଡ଼ିଆ କ୍ୟାଲେଣ୍ଡର), accessible at https://theodiacalendar.com, we are committed to upholding the highest standards of factual accuracy, cultural authenticity, and editorial transparency.

Because calendrical calculation involves complex astronomical timestamps, traditional panjika ephemerides, and evolving government holiday notifications, factual errors or ambiguities can occasionally occur. When an inaccuracy is identified, we take prompt responsibility to investigate, correct, and document the change clearly.

This Corrections Policy outlines our practical three-level correction framework, how readers can submit factual inquiries, and how corrections are documented for public awareness.


1. How Readers Can Report Factual Inconsistencies

We welcome factual feedback, discrepancy reports, and source citations from cultural observers, panjika researchers, devotees, and general visitors.

Verified Reporting Channels

All factual inquiries and correction requests should be sent directly to our verified editorial desk:

  • Primary Editorial Desk: editor@theodiacalendar.com
  • Support & General Inquiries (cc): info@theodiacalendar.com / contact@theodiacalendar.com
  • Subject Line Format: Correction Request: [Page Title / URL]

Information Needed to Assist Investigation:

To enable our editorial team to verify your report efficiently, please include:

  1. Specific URL: The exact web address of the page containing the disputed date or statement.
  2. Current Statement: The date, tithi, timing, or text currently published on the page.
  3. Proposed Correction: The specific factual correction you are recommending.
  4. Primary Source Citation: The authoritative source supporting the correction—such as the specific Panjika title, edition year (Sal / CE), and page number; or the official Government Gazette notification number and date.

2. Our Three-Level Correction Framework

We classify corrections into three practical tiers based on the nature, severity, and sitewide impact of the issue:

Level 1 — Minor Editorial & Typographical Corrections

  • Definition: Minor typographical errors, misspelled Odia or English words, grammatical slips, broken hyperlinks, or visual formatting glitches that do not alter the substantive factual or calendrical meaning of the page.
  • Reporting & Identification: Reported by readers via email or discovered during routine editorial proofreading.
  • Verification: Evaluated directly against the page text and verified by an editorial contributor.
  • Reader Disclosure: The correction is applied directly to the article text or HTML markup. Because the underlying dates and factual information remain unchanged, a formal public correction note is generally not appended to the page.
  • Review Scope: Confined to the specific URL where the typographical slip occurred.
  • Internal Logging: Recorded through standard system version control and database update timestamps.

Level 2 — Material Factual Corrections

  • Definition: A substantive factual error involving a festival date, tithi transition timestamp, solar ingress (Sankranti) moment, government public holiday status, or banking holiday classification.
  • Reporting & Identification: Submitted by readers with source citations or identified during periodic re-verification against primary panjikas and official government gazettes.
  • Verification: The claim is independently cross-checked against primary physical texts (e.g. Kohinoor Press Panjika, Biraja Panjika, Positional Astronomy Centre ephemerides, or Government of Odisha Gazette notifications).
  • Reader Disclosure:
    1. The factual content within the article, calendar table, and structured data is corrected immediately.
    2. A clear, dated Editorial Correction Note is appended to the bottom of the article explaining:
      • The prior incorrect statement or date.
      • The corrected factual statement.
      • The date the correction was made.
      • The authoritative primary source that substantiated the change.
  • Review Scope: Editorial contributors perform an impact check across directly related pages—including the corresponding monthly calendar hub (e.g. Odia Calendar October 2026), category index pages (e.g. Festivals or Holidays), and related sibling articles.
  • Internal Logging: The editorial desk records a before-and-after snapshot, source evidence, and editorial justification in our internal revision records.

Level 3 — Systemic or Calculation Discrepancies

  • Definition: A shared ephemeris calculation defect, recurring holiday rule error, or programmatic database discrepancy that affects multiple calendar pages, monthly matrices, or event records across the website.
  • Reporting & Identification: Discovered through comprehensive codebase audits, astronomical calculation reviews, or multiple corroborating expert inquiries.
  • Verification: Conducted as a comprehensive technical and astronomical review. The calculation rule is audited across modern astronomical ephemerides (Drik-siddha) and traditional panjika texts (Surya Siddhanta), cross-referencing multiple months or years.
  • Reader Disclosure:
    1. All affected event records, monthly calendar tables, and structured data schemas are updated across the site.
    2. An explanatory editorial note is added to each significantly affected hub page.
    3. A summary notice is published in the public corrections record on this page, outlining the nature of the calculation adjustment and its sitewide scope.
  • Review Scope: Comprehensive sitewide audit across all 12 monthly calendar hubs, the annual calendar matrix, category indexes, and related cultural guides.
  • Internal Logging: Documented with a complete technical remediation report, pre-change and post-change database snapshots, and automated test suite verification.

3. Turnaround Timelines

We take factual corrections seriously and follow defined response targets across our verified desks:

  • Initial Acknowledgment: Reader correction emails sent to editor@theodiacalendar.com or info@theodiacalendar.com are acknowledged within 24 to 48 business hours.
  • Primary Verification: Cross-checking against physical panjika texts and government gazettes is completed within 3 business days.
  • Deployment of Verified Corrections: Verified corrections are published immediately to live production systems.

4. Public Corrections Record (Archive)

To maintain transparent accountability, Odia Calendar maintains a public ledger of all Level 2 (Material Factual) and Level 3 (Systemic) corrections implemented across our website.

(Note: Minor Level 1 typographical corrections are not cataloged here, as they do not affect factual dates or cultural observances.)

Published Corrections Ledger

Correction Date Affected URL / Article Nature of Correction Prior Statement Corrected Statement Authoritative Source Cited
No material public corrections have been implemented under this policy version to date. All published calendar dates have been verified against primary 1433–1434 Sal printed Panjikas and official government gazette notices.

Future verified Level 2 and Level 3 corrections will be published in this ledger chronologically upon editorial implementation.


5. Editorial Integrity & Independence

  • No Retrospective Whitewashing: When substantive factual errors occur, we do not quietly alter facts without leaving an audit trail. Material corrections remain documented for visitor awareness.
  • Respect for Cultural Panji Traditions: When traditional panjikas differ (such as variations between Kohinoor and Biraja calculations), we document both dates with neutral explanatory context rather than declaring one traditional school "erroneous."
  • Verified Contacts: For questions regarding our correction procedures or past editorial revisions, please email our verified addresses at editor@theodiacalendar.com, info@theodiacalendar.com, or contact@theodiacalendar.com.